How to Install an ActivWall 135

DESCRIPTION

After the ActivWall has been assembled, it is ready to be mounted on a wall. Be sure the projector mount has been installed before attempting to mount the ActivWall.

CHECKLIST

  • ActivWall 135

  • ActivWall 135 Installation & User Guide (TP-1982)

  • Wall Brackets

YOU WILL NEED

  • Drill

  • Eye Protection

  • Ladder

  • Pencil

  • Screwdriver

  • Spirit Level

  • Tape Measure

  • Wall Anchors

HIGHLIGHTS

Skip to a section:

Locating the installation position - Identify the correct installation position and install the wall brackets.

00:24

Installing the wall brackets - Part I - Drill the holes and use appropriate wall anchors to attach the brackets to the wall.

00:50

Aligning the projector - Refer to the related video about projector alignment, and adjust the projector so that the image fills the ActivWall.

01:05

Adjusting the wall brackets - If the image is too high or too low, use the steps in the installation guide to adjust the height of the wall brackets.

01:26

Installing the wall brackets - Part II - Use the installation guide to locate the measurements for the other wall brackets, and install them.

02:08

Assembling the ActivWall - Refer to the second half of the related video about ActivWall assembly, to finalize the installation.

02:26